PETROLEUM SOLUTION SPOTLIGHT

Supporting operations in the Mediterranean's largest natural gas field

Mantrac successfully supplied emergency diesel generators for the initial phases of this project. Owing to outstanding delivery, Mantrac was also entrusted with Phase 2 of this project.

This project played an important role in doubling of Egypt's gas reserves. To ensure success , Mantrac conducted a complete risk assessment, sourced the best material from 5 countries and executed a reliable and cost-effective solution using Cat and non-Cat products.

850 billion ft3

Available gas in the Zohr gas field

10

Number of Cat® generators in Phase 1 and Phase 2

1500 metres

Depth at the site, located 180 kilometres from Port Said

Popular Industry Solutions

Mantrac customers have successfully applied our tailored solutions across industry applications.

C175-16 Offshore Generator Set
Offshore Generator Sets

C175-16 Offshore Generator Set

Minimum Rating 1833 ekW

Cooling System - Engine 77 l

3512 Offshore Production Engine
Fire Pump Engines

3512 Offshore Production Engine

Minimum Rating 1066 bkW

Lube Oil System - Refill 160 l

Length 2890 mm

3512B (50 Hz) Generator Set
Diesel Generator Sets

3512B (50 Hz) Generator Set

Length - Minimum 5249 mm

3512C (HD) Offshore Generator Set
Offshore Generator Sets

3512C (HD) Offshore Generator Set

Minimum Rating 1550 ekW

Width 1825 mm

Cooling System - Engine 157 l

Service solutions

Discover the range of support options from Mantrac for operations that run smoothly and efficiently.

Training
Training
We can train your personnel to harness the full potential of your investment as well as conduct maintenance work.
Consulting
Consulting
Let us help you find the best starting point for a powerful bio-gas solution that is tailored for your application.
Installation
Installation
Our electrical, mechanical and technical experts can install your entire power solution for you.